Case study details
Daventry UTC, Daventry
Client
Daventry District Council
Architect
Faulkner Browns
Main Contractor
Shepherd Construction
SIP Installer
Roofdec Ltd
SIP Fabricator
SIPCO Ltd
Project Size 1300m²
Programme: 3 Weeks
SBS worked very close with the Roofdec team to develop large format panels, on average Roofdec installed 7.6m x 2.4m panels in one lift allowing them to install 5 bays in 4 hours.